Missions and controls

Missions and controls are entered by the FMC (super users) in the side window. Missions are shared with Monitorenv : a mission can contain both fisheries controls (entered in Monitorfish) and environmental actions (entered in Monitorenv).

Missions list

The missions list can be filtered by period, administration, control unit, mission type (sea, air, land), status, completion of data, control results, JDP missions and vessel.

From this list, activity reports (Act-Rep) can be exported for each Joint Deployment Plan.

List of missions

List of missions

Mission form

A mission has :

  • one or several control units and their resources

  • one or several types (sea, air, land), and whether it is under a Joint Deployment Plan (JDP)

  • its dates, zones and observations

Actions of the mission can be :

  • sea controls and land controls (inspection reports)

  • air controls and air surveillance

  • observations

Inspection reports

Mission form : general information, actions of the mission and the inspection report of a sea control

Mission form : general information, actions of the mission and the inspection report of a sea control

The inspection report form of a control records :

  • the controlled vessel - its groups and open Reportings are displayed when it is selected

  • the position (sea controls) or the port (land controls) of the control

  • the compliance of VMS and AIS emissions, logbook declarations, licences and authorizations

  • the gears controlled, with their mesh

  • the species onboard, with declared and controlled quantities, the margin of tolerance, undersized and discarded quantities - species are prefilled from the vessel’s logbook

  • the infractions found (NATINF codes, sorted by family and type), with their result, and seizures (gears, species, vessel)

  • whether the vessel is subject to IUU regulations

  • the fleet segments, computed from the controlled data

The form is saved automatically. Its completion status lists the missing fields, so that missions can be checked and completed.

The controls are then displayed in the vessel’s controls history (see Vessel sheet) and used to compute its risk factor and fleet segments control statistics.

The data model of inspection reports is being aligned on the EFCA electronic Inspection and Surveillance Report (e-ISR) ; the corresponding fields are enabled progressively.